KOORDINASI KERJA OVER CURRENT RELAY DAN GROUND FAULT RELAY

PADA PENYULANG EVAKUASI 1 (PLTU HOLTEKAMP – GH YARMOKH)

Authors

  • Silverius Ferdi Ulahayanan Universitas Cenderawasih
  • Afner S. Sinaga Universitas Cenderawasih
  • Rosalina N Revassy Universitas Cenderawasih
  • Dultudes Mangopo Universitas Cenderawasih
  • Ekawati M. Ohee Universitas Cenderawasih
  • Suparno Universitas Cenderawasih

Keywords:

protection system, over current relay, ground fault relay

Abstract

PLTU HOLTEKAMP  is a  unit that  provides  electricity services in  Jayapura  City,  as a  means  to  distribute electricity from substations to consumers. taken from PLTU HOLTEKAMP Jayapura City. The distribution system of 20 kV PLTU HOLTEKAMP at the EVAKUASI 1 feeder has a protection system. The purpose of this final project is to determine the magnitude of the 3-phase, 2-phase, and 1-phase short-circuit fault currents to ground and determine the settings for the overcurrent relay (OCR) and the ground fault relay (GFR) in the Black Ground Feeder. The method used is a literature study. The data taken is in the form of secondary data taken from PLTU HOLTEKAMP. The first step in data processing is calculating impedance, calculating short-circuit fault current and setting up Over Current Relay (OCR), Ground Fault Relay (GFR). The calculation results obtained are that the largest short circuit fault current is caused by a 3 phase short circuit fault at 0%, namely 5761.95 A and is used to calculate the TMS overcurrent relay. Meanwhile, the smallest short circuit current is caused by a single phase short circuit at 100%, namely 0,256 A and is used to calculate the TMS of the ground fault relay. The OCR time grading in the installed condition is in accordance with the IEC 60255 standard so that adjustments are carried out and the results obtained are that the OCR working time on the incoming top side = 0.700 seconds and on the top feeder side = 0.300 seconds. Time grading between OCRs is in accordance with IEC 60255 standards, namely 0.400 seconds. Meanwhile, the GFR time go in accordrading in the installed condition is alsance with the IEC 60255 standard, so that the results of the GFR working time on the incoming side are t = 0.300 seconds and on the feeder side to =0.700 seconds. Time grading between GFRs is in accordance with IEC 60255 standards, namely 0.400 seconds.

 

References

Anderson, P.M. 1999. Power System Protection. USA: IEEE Press Power Engineering Series, John Wiley & Sons, Inc.

Hewitson Leslie, Mark Brown, Ramesh Balakrishnan. 2004. Practical Power System Protection. 1st Edition. Netherlands: Newnes Publications.

Hutauruk, T.S. 1985. Transmisi Daya Listrik. Erlangga. Jakarta. I. Safitri, P. Studi, T. Elektro, F. T. Industri, U. Islam, and S. Agung, “Analisa koordinasi setting over current relay (OCR) outgoing 20kv dan Recloser pada Trafo II 60 MVA feeder RBG 01 di Gardu Induk 150kv

Rembang,” p. 145, 2020.

Limbong dkk. 2019. Evaluasi Setting Relai Arus Lebih Dan Relai Gangguan Tanah Di Gardu Induk Ngabang. Jurnal. Pontianak: Universitas Tanjung Pura Pontianak.

Sarimun, W. (2016). Proteksi Sistem Distribusi Tenaga Listrik. Wahyudin Irwan. (2007). Gangguan Yang Terjadi Pada Jaringan SUTM 20 Kv Beserta Dampak Yang Ditimbulkan.

Zulkarnaini, (2014). Evaluasi Koordinasi Over current relay (OCR) dan Ground fault relay (GFR) pada Feeder GH Lubuk Buaya

Published

2023-11-01

How to Cite

Ulahayanan, S. F., Sinaga, A. S., Revassy, R. N., Mangopo, D., Ohee, E. M., & Suparno. (2023). KOORDINASI KERJA OVER CURRENT RELAY DAN GROUND FAULT RELAY: PADA PENYULANG EVAKUASI 1 (PLTU HOLTEKAMP – GH YARMOKH). Jurnal Teletronic, 1(2). Retrieved from https://teletronic.elektrouncen.com/index.php/teletronic/article/view/18

Issue

Section

Articles

Most read articles by the same author(s)

1 2 > >>